Well, I’ve postponed this post for 3 days because I wanted to have pictures to go with it but I still haven’t taken them.  I think I must be the worst costumer ever but hopefully you all will forgive me. :)

Last weekend I got a lot of work done on my Flanders gown.  I ironed all my pieces, put the bodice together, lined the skirt, attached the skirt, and even did most of the hand finishing.  In fact right now it is sitting on my dress form lacking only sleeves, a hem, and it’s front fastening.  I’ve even started the sleeve mock up although I think I still need to tweak it a bit.

Tonight I need to pack for KASF so I doubt I’ll have a chance to work on the sleeves but I am going to try to get pictures up so at least y’all will be able to see it in its current state.

Don’t forget our Tutorial BOGO Special!

We are still running a special on our tutorials through February 6th at midnight! From now through then if you purchase one of our tutorials I will email you the second tutorial for free! Please see my website for details!

Sorry there was not a practice update this week.  I was very busy with work on Thursday and unable to make it out.  Hopefully this week will be easier and I will be able to make it out.  I’ve really enjoyed the last few practices and it feels good to be out again even if it is freezing cold in NC this winter.

Not much happened with the Flanders gown this weekend.  We helped friends move into their (very beautiful) brand new house on Saturday, Saturday and Sunday I had to go into work to check on a freezer that decided to start acting up Saturday, and I spent Sunday afternoon running a low grade fever, drinking lots of juice, and working on a web design project.  I’ve been thinking though that I would really like to wear the gown to KASF in a couple of weeks (Feb 5th).  Everything is cut out and the interlining has been stiffened so I really think I could finish it up by then if I set some time aside for it.  So my plan for tonight is to make sure everything is ironed and sketch out a rough schedule for myself.

The other thing I’ve been considering over the past week is what to do about my site and my expanding costuming interests.  I’ve been branching out more and more into 19th and early 20th century fashions.  However discussing them and putting them up on “Elizabethan Mafia” seems out of place.  I’d like to continue to keep Elizabethan Mafia focused but at the same time I’d like to start discussing my other costuming endeavors.  Currently I have several options running around in my head:

  1. Just keep everything at Elizabethan Mafia.  I’ve spent six years building a following here and this is already how everyone knows me.
  2. Make a second site dedicated specifically to 18-20th Century costuming and keep my 14th-16th Century costuming and HMA research at Elizabethan Mafia.
  3. Refocus Elizabethan Mafia around my HMA research and move all my costuming to a new site.
  4. Build an entirely new site from that would cater to all my interests and redirect traffic to it from Elizabethan Mafia.

Thoughts?  Suggestions?  Am I over thinking it?  Am I crazy?  (Most likely but it would be nice if you all told me no.  :) )

Sorry for all the quiet last week.  With the ice storm we got last Tuesday and the holiday yesterday I’ve been completely thrown off schedule-wise.

I did make it to practice last week although sadly it appears last week was my goob practice*.  I forgot my contacts, forgot just about everything else, felt sick, etc…etc…etc.  I still fought just not particularly well.  Ah well, these things happen.  I just need to make sure that they don’t happen again this week.

I did spend some time working on my Flanders gown this weekend.  I didn’t get a lot done but I did get the remaining pieces cut out so I can finally get started on the assembly.  I also think I’ve changed my mind about the sleeves again.  I really need to get this project done just so I can stop changing my mind about it.  I also fit my shell jacket mock up.  It’s currently still up on my dress form as I debate making some other alterations to it but otherwise I’m pretty happy with it.

*goob practice:  That particular practice when coming back to regular practice from a break when a fighter seemingly forgets everything they’ve ever known.  It may be the first practice back or it may wait until practice 2 or 3 to strike.

It’s New Years Day which means it’s time look back on the projects I’ve finished and the goals I set for myself over the last year and start planning out the ones I want to work on this year.

2010 Goals:

1)  Continue to work on my physical fitness and fighting.
2)  Only have one embroidery project at a time.  Until it’s finished this means my jacket.
3)  Do more sewing.
4)  Learn to play 2 pieces of music appropriate to Elizabethan England by Pennsic.
5)  Spend more time with my students.
6)  Continue to post Silver and Swetnam installments weekly.

I had a lot of false starts with my first goal of working on my physical fitness and fencing.  I would stay focused for a few weeks and then drop off.  I was really disappointed with myself in this.  These were really important goals for me and I let myself set them on the back burner over and over again.

I did OK with goals two and three.  I couldn’t maintain working on a sewing project and an embroidery project at the same time but I did enjoy more sewing projects this year and kept myself focused on the one embroidery project (my jacket) even if I didn’t get as far on it as I would have liked to.

I wrote about goal four recently already.

I did enjoy spending more time with my students both on and off the field this year and I’m looking forward to even more next year.

I did not continue with my Silver and Swetnam series mostly because I’ve decided to change those projects slightly.  Instead of working on them in a series I’ve decided I want to publish them all at once.

2010 Planned Projects

Get my fencing in top notch shape In progress
Embroidered Jacket In progress (Started August 2009)
Flander’s Gown In progress
Silver Training Blog Series In progress
Swetnam Training Blog Series In progress
Steampunk Gown Finished! January 2010
Wrapped and Stuffed Buttons @ Etsy Opened! January 2010
Grey Wool Bias Cut Hosen Finished! February 2010
Linen Kirtle Finished! April 2010
White Linen Bias Cut Stockings Finished! April 2010
16th-17th Century Stocking Tutorial Finished! April 2010
Blue Linen Bias Cut Hosen Finished! May 2010
14th Century Hosen Tutorial Finished! May 2010
Saviolo Dueling Blog Series Finished! June 2010
Early Modern English Dueling Class Finished! June 2010

Green Linen GFG Finished! September 2010
Burgundy Linen Effigy Bodies Finished! October 2010
Recreating Elizabethan Bodies Tutorial Finished! October 2010
Monochrome Embroidery Tutorial Finished! December 2010
French-Cut gown
A new linen suit
Natural Form Gown

2011 Goals

1)  Continue to improve fitness and fencing
2)  Have one sewing project a month
3)  Publish a new ebook every 1-2 months
4)  Be able to play 1 Elizabethan popular song by December

In December I rededicated myself for improving my fitness and I’m pleased to say that I was able to stay pretty straight and mostly narrow even through the Holidays.  I have also begun outlining my plan for working on my fencing one already and I plan on discussing them in more detail when their more firm.  My first fitness and fencing goals revolve around Gulf Wars and I will be discussing them in future posts.  My other goals are all pretty self explanatory. In order to keep myself on track and focused I’ve decided to keep my total number of goals this year lower than last and I will be posting monthly updates.

2011 Planned Projects

Get my fencing in top notch shape In progress
Embroidered Jacket In progress (Started August 2009)
Flander’s Gown In progress
Silver Training Manual In progress
Swetnam Training Manual In progress
14th Century Cloth Hosen ebook
New Rapier Armor
Shirt, Brais, Hosen
Charles de Blois Pourpoint
Edwardian Lingerie Gown
Arming Garments Class

The first non-fencing related projects I will be working on are the 14th Century Cloth Hosen ebook and finishing my Flanders Gown.

For those of you who are not on Facebook (or who may have missed my post yesterday) last night I finished my 16th and early 17th Century stockings tutorial reformat. My plan is to have it available on my site as the first in a series of ebooks before the end of the year.  I’m very excited about this project.  I’ve been wanting to do a series of costuming and martial arts ebooks for Elizabethan Mafia for a while and I’m very excited to be starting the project with this tutorial.

I’ll be turning in my latest article for Foundations Revealed this evening after giving it one more review.  I’m pleased with the finished article and it’s been a lot of fun to work on.  It’s currently scheduled for publication in January and I’ll be sure to let you all know when it’s available.

This means other than getting my stockings article up I’m pretty much free through the end of the year and I’m thinking about what I want to work on next.  I have a web design project I’m working on but it doesn’t have a hard deadline.  I’m thinking about trying to finish up my Flander’s Gown by the end of the month and I’m also currently throwing around some ideas in my head for a project for a steampunk party we’re thinking of attending New Year’s Eve.  Maybe I’ll do both.

Or maybe I’ll enjoy some celebratory sushi before making any decisions.

Just a short post this morning but I wanted to let you all know that my 16th and Early 17th Century Cloth stocking tutorial (the one that was published at Foundations Revealed this past May) is going to be available through my website very soon.  I want to do a little reformatting first but I’m hoping to have it available before the end of the year.

My green linen kirtle pre-eyelets.

There are now just 19 eyelets standing between me and finishing my new green linen kirtle!  There were 34 to do when I started and I’ve finished 15 so far.  It takes me about 5-6 min to do one eyelet so I’m feeling fairly optimistic that I will have it finished in time for Midnight at the Oasis this weekend.

More »

The current state of my new green linen Kirtle. The sleeves are attached, the hand finishing is done, and now all I need to do is hem it and sew the eyelets.

I spent most of this past weekend working on projects for various upcoming events.  My poor husband was on call all weekend which meant changing the planned projects around a bit but in the end I got quite a bit accomplished.

More »

I’ve probably mentioned it here before but for the past year and a half at least I’ve had an unfinished green linen gothic fitted gown sitting on my shelf waiting to be picked back up.  It was all cut out, it just needed to be assembled.

More »

Get Adobe Flash player